Construction Progress

Scheduled orthomosaic capture over live sites — dated, comparable progress records with change highlighted between visits, ideal for main contractors and project monitors.

RECURRING

What we check for

  • Dated orthomosaic capture, directly comparable flight to flight
  • Change highlighted between this visit and the last
  • Earthworks, groundworks and structural progress against the visible programme
  • Site access, storage and general site condition
  • A record suitable for main contractor or project monitor reporting

An example of what you get back

Every finding in every report follows the same structure — location, frame reference, affected area, confidence, probable cause and recommended action, rated Red / Amber / Green. Here's a worked (illustrative) example from this survey type.

Finding 1: Plot 4 — Earthworks Progress

LocationPlot 4, site north
Frame referenceOrthomosaic, this visit vs previous
Estimated affected areaWhole plot
ConfidenceHigh
Severity rating (RAG)GREEN

Observation: Earthworks on Plot 4 are visibly complete since the last visit, with foundation formation now underway.

Probable cause: N/A — progress record, not a defect.

Recommended action: No action required; provided for progress monitoring records.

Dated orthomosaic with change area outlined

See a full sample report →

How the RAG rating works

Every finding on every survey type is rated against the same published definitions, so a Red on one job means the same thing as a Red on the next.

● RedA live risk of water ingress, structural risk, or a safety hazard — flagged for prompt action.
● AmberLikely to progress to failure if left unaddressed, but not currently causing a problem.
● GreenCosmetic or early-stage — worth recording, not urgent.